Tag Archive for installation

TVS NTORQ 125 sets up a one-of-a-kind installation: NTORQ-o-TRON in PVR Oberoi Mall, Goregaon, Mumbai

Share/Bookmark

By Vivek K. Mobile: 09920183006 Email:indianshowbusiness@gmail.com

TVS NTORQ 125, – presenting partner of the film Bumblebee in India, has set up a one-of-a-kind installation in PVR Oberoi Mall, Goregaon, Mumbai. NTORQ-o-TRON, a TVS NTORQ inspired Transformer is a testimony to the scooter’s characteristic style, performance and technology which is likened to the Transformers universe. Created by Mr. Rahul KP – a Bengaluru based artist, this structure has been fashioned completely using parts of TVS NTORQ 125. NTORQ-o-TRON will be installed across select PVR malls in Mumbai, Delhi, Chennai & Bengaluru.

Read more

LUX Industries goes Green with Solar Unit installation at Dankuni Plant

Share/Bookmark

By K Ashwin Mobile: 09920183006 Email:indianshowbusiness@gmail.com

Lux Industries Limited (BSE: 539542 | NSE: LUXIND) known for its innovative and customer-demand driven product offerings, creating new benchmarks for quality and comfort over the years is now going green in a bid to replenish the environment and reiterate their commitment towards nature and mother earth. The company recently installed a 1 Megawatt solar unit in their plant at Dankuni which is spanned over 6 lakh sq. ft. and is one of the largest facility in the hosiery industry. The Dankuni plant was inaugurated in June 2016. With this solar installation Lux became one of the rarest private sector companies who have been able to setup a solar unit in one of their factories. The company shelled out INR 5 Crore approximately for the project. Read more

NTPC- NETRA optimizes Water Conservation with Installation of Effluent Recycling Treatment Plant at Jhanor – Gandhar

Share/Bookmark

By K Ashwin Mobile: 09920183006 Email:indianshowbusiness@gmail.com

NTPC, India’s largest power generating company, is fully aligned for conserving water for sustainable ecological balance.  NETRA (NTPC Energy Technology Research Alliance) proposed Effluent Recycling Treatment plant to achieve zero liquid discharge at NTPC’s Jhanor – Gandhar station to optimize water costs and minimize environmental footprint.

 

The recycled and reuse of treated effluents is profitable in the ever deteriorating environment of water scarcity. At present, only one stream of the station has been successfully commissioned and the next stream will be commissioned by 7th Sep’18. At full load operation, NTPC Jhanor – Gandhar (657.39 MW) generates effluent of 4500 M3 per day.  The new recycling treatment has integrated high rate solid contact clarification, submerged Ultra filtration and RO modules technologies to give 125 M3/Hr high quality water. The produced water will be used for Demineral (DM) water production or directly in Cooling Water (CW) make-up in the power station.

 

As a part of its corporate ethos, NTPC aims at utilization of industrial waste water to ensure a sustainable ecological balance by minimizing waste and reusing the waste water at its power stations. With new technologies, the plant will have the added advantage of increased resin life, lesser chemical consumption and improved COC in CW system. The new technology system suits the wide variety of industrial effluents and maintains the efficiency of plants. Read more